Electrostatic Precipitator
The Electrostatic precipitators removes dust from emission sources utilizing the principal of corona discharge. We strictly fulfill the global dust discharge standards with our highly efficient electrostatic precipitators for Yeongheung thermal power plant 1~4 units, Hadong thermal power plant 7~8 units, Samcheonpo 5~6 units which is retrofit system, Mundra plant in India, and Cirebon in Indonesia.
Projects
No. | Project Name | Client | Size/specification |
---|---|---|---|
1 | Yeongheung thermal power plant #1,2 electrostatic precipitators | Korea South-East Power Co.,Ltd | 800 MW x 2 |
2 | Yeongheung thermal power plant #3,4 electrostatic precipitators | Korea South-East Power Co.,Ltd | 870 MW x 2 |
3 | Hadong thermal power plant #7,8 electrostatic precipitators | Doosan Heavy Industries & Construction.Co., Ltd | 500 MW x 2 |
4 | Cirebon electrostatic precipitators in Idonesia | Doosan Heavy Industries & Construction.Co., Ltd | 695 MW x 1 |
5 | Mundra electrostatic precipitators in India | Doosan Heavy Industries & Construction.Co., Ltd | 800 MW x 5 |
6 | Samchonpo thermal power #5,6 electrostatic precipitators | Korea South-East Power Co.,Ltd | 500 MW x 2 |
Fabric Collectors
As environmental standards and regulations for dust emission are getting stricter and stricter, Halla Energy & Environment developed the high efficient fabric collectors by improving the large scale electrostatic precipitators which were mainly used in cement kilns and proven the better performance and results.Also, our air coolers and fabric collectors of high efficiency that is the pre-treatment facility at the steel mill where the large volume of high-temperature is emitted maintains reputations at all installation sites for its superior performances
Projects
No. | Project Name | Client | Size/specification |
---|---|---|---|
1 | ISPAT electrostatic precipitators in India | ISPAT | 1,020,000A§©/hr x 1unit |
2 | Hyundai steel #3 sintering furnance of electrostatic precipitators | Hyundai Rotem Company | 900,000A§©/hr x 2unit |
3 | Dangjin factory of Hyundai Steel electrostatic precipitators | Hyundai Steel Company | 3,600,000A§©/hr x 1unit |
The flue gas desulfurization (FGD) system removes sulfur oxides present in flue gas produced in boilers and power generation plants utilizing coal or heavy oil as fuel. Halla¡¯s FGD system having well-arranged nozzles to spray overlapping in several layers according to the gas flow, has outstanding efficiency in removal of sulfur oxides. Also, Halla FGD offers the advantages of economical initial investment and low operation & maintenance costs as well. High purity gypsum, a by-product, can be used in making gypsum board, an adhesive mixture for cement, an improving agent for soil and as a road paving material.
Projects
No. | Project Name | Client | Size/specification |
---|---|---|---|
1 | Boryeong thermal power plant # 7, # 8 flue gas desulfurization system | Korea Midland Power Co., Ltd | 500 MW x 2Unit |
2 | Boryeong thermal power plant # 1, # 2 flue gas desulfurization system | Korea Midland Power Co., Ltd | 500 MW x 2Unit |
3 | Honam thermal power plant # 1, # 2 flue gas desulfurization system | Korea East-West Power Co., Ltd | 250 MW x 2Unit |
4 | Yeosu thermal power plant # 1 flue gas desulfurization system | Korea South-East Power Co.,Ltd | 340 MW x 1Unit |
5 | Yeongnam thermal power plant # 1, # 2 flue gas desulfurization system | Korea South-East Power Co.,Ltd | 200 MW x 2Unit |
Halla Energy &Environment is equipped with its own design and supply capacity for selective catalytic reduction (SCR) flue gas denitrification systems. Halla has successfully executed construction of a denitrification system for unit #4 of the Seoul thermal power plant, the first denitrification facility installed in a thermal power plant in Korea. The selective catalytic reduction (SCR) is the system to decompose nitrogen oxide generated from combustion into harmless nitrogen and vapor before emission to atmosphere by passing the exhaust nitrogen through the catalytic layer along with reductants (ammonia or urea).
Projects
No. | Project Name¸í | Client | Size/specification |
---|---|---|---|
1 | Seoul thermal power plant # 4, # 5 flue gas denitrification system | Korea Midland Power Co., Ltd | 137.5 MW x 2 unit 250 MW x 1 unit |
2 | Samcheonpo thermal power plant # 3 & #4 flue gas denitrification system | Korea South-East Power Co.,Ltd | 560 MW x 2 unit |
3 | Hyundai green power thermal power plant # 5 ~ # 8 flue gas denitrification system | Hyundai Green Power | 100 MW x 4 unit |
4 | Dangjin thermal power plant # 9 & 10 flue gas denitrification system | Daelim Industrial Co., Ltd | 1,000 MW x 2 unit |